“Regarding a catastrophic piping failure, within 30 minutes of receiving our call around 7 a.m., your technicians and supervisors were at our location, with tools and equipment, ready to work. Brewer-Garrett was even able to respond with a second crew at our request to perform simultaneous work on a different part of the system while it was drained for the repair. It is this type of response and performance that validates our choice in The Brewer-Garrett Company as our trusted partner in maintenance of our facilities.”
Blair R. Bosworth
Executive Director, Plant Operations
Cuyahoga Community College
“Working with the Brewer-Garrett Company we found their engineering personnel very knowledgeable in performing engineering and utility analysis services as well as having extensive knowledge of building automation systems. Throughout the duration of the contract the Brewer-Garrett team has shown a high level of commitment to working with the Cuyahoga Community College administration and staff members.”
Jerry Sue Thornton, Ph.D.
President
Cuyahoga Community College